Building Design Standards

Section Subject  

Origination Date 

Revision Date

Division 1 - General Requirements  

 1010 Summary of Work 

11/2004  
 1020 Allowances     
11/2004  
11/2004  
11/2004  
 1050 Field Engineering  11/2004  
 1120 Remodeling Procedures  11/2004  
 1160 Contractor Requirements   11/2004  
 1200 Project Meetings   11/2004  
 1300 Submittals   11/2004  
 1311 Schedules   11/2004  
 1370 Schedule of Values   11/2004  
 1410 Testing and Inspection Services   11/2004  
 1430 Field Constructed Mockups   11/2004  
 1500 Temporary Services and Facilities   11/2004  
 1532 Tree Protection   11/2004  
 1700 Contract Close-Out 11/2004  
 1720 Project Record Documents   11/2004  
 1740 Warranties   11/2004  
 1760 Preventative Maintenance   11/2004  
 1820 Demonstration and Training   11/2004  

Division 2 - Sitework 

 2200 Site Designs  11/2006  
 2500 Concrete, Sidewalks, Curbs, and Wheel Stops  11/2006  
 2630 Storm Drainage  11/2006  
 2800 Lawns, Landscape and Irrigation   11/2006  
 2830 Fences and Gates   11/2006  
 

Division 3 - Concrete 

  3300 Cast-In-Place Concrete  11/2006  
 

Division 4 - Stone and Masonry 

  4050 Stone and Masonry  11/2006  
 

Division 6 - Wood and Plastics

   
  6600 Wood Millwork and Carpentry  5/2007  
 

Division 7 - Thermal and Moisture Protection

  7320 Tile Roofing  11/2007  
  7612 Metal Roofing   10/2007  
  7900 Joint Sealants  11/2007  
 

Division 9 - Finishes

  9000 Interior Finishes for Standard Spaces  11/2006  
  9200 Finishes: Plaster   11/2006  
  9510 Finishes: Acoustic Ceiling Systems   11/2006  
  9660 Finishes: Resilient Flooring   11/2006  
  9682 Finishes: Carpet   11/2006  
  9900 Finishes: Painting   11/2006  
  9950 Finishes: Wallcovering  11/2006  
 

Division 13 - Special Construction

  13200 Security Monitoring and Access Control  11/2006  
 

Division 14 - Conveying Systems

   
  14200 Conveying Systems  4/2007  
 

Division 15 - Mechanical

   
  15080 Insulation   11/2004  
  15083 Plumbing Piping Insulation  11/2004   
  15100 Mechanical Piping Systems  11/2004  
  15120 Plumbing Piping Basic Requirements   11/2004  
  15125 Plumbing Drains and Specialties   11/2004  
  15140 Domestic Water  11/2004  
  15150 Sanitary Piping   11/2004   
  15160 Storm Piping   11/2004   
  15170 Fuel Oil Piping  11/2004   
  15180 Gas Piping  11/2004   
  15190 Lab Gases (Vacuum, Air, Etc.) Piping  11/2004  
  15200 Acid Waste and Vent Piping   11/2004  
  15300 Fire Protection   11/2004  
  15400 Plumbing Equipment   11/2004  
  15410 Plumbing  11/2004  
  15700 Air Systems  11/2004  
  15800 Duct and Terminals  11/2004  
  15900 Control Systems  11/2004   
 

Division 16 - Electrical

   
  16050 General Electrical  05/2004  
  16110 Raceway Systems  05/2004  
  16111 Cable Tray   05/2004   
  16112 Surface Metal Raceway  05/2004   
  16114 Underground Duct System  05/2004   
  16120 600v Wiring   05/2004  
  16140 Wiring Devices  05/2004   
  16280 Surge Protection Devices   05/2004  
  16320 Medium Voltage Transformers   05/2004   
  16335 15ky Automatic Transfer Switch   05/2004   
  16375 Medium Voltage Cable   05/2004  
  16400 Power Distribution   05/2004   
  16420 Electrical Service Entrance   05/2004   
  16500 Lighting   05/2004   
  16620 Generator   05/2004  
  16670 Lightning Protection Systems   05/2004   
  16680 Power Distribution Units (PDUs)   05/2004  
  16720 Fire Alarm System   05/2004  
  16740 Telecommunications and Data Systems   05/2004   
  16915 Programmable Lightning Control System  05/2004  
 

Appendices

  Appendix A - Rice University Space Standards     
  Appendix C - Application and Certificate for Payment     
  Appendix D - Rice University Tree Preservation Guidelines     
  Appendix E - Finish Schedule - Interior     
  Appendix E - Finish Schedule - Exterior    
  Appendix F - Project Warranty for General Construction     
  Appendix G - Special Warranty     
  Appendix H - FE&P Equipment Status Form     
  Appendix I - Standard Specification for Rice University Traction and Hydraulic Elevator(s)